2 / 10
Cards complete with desk evidence
037a · 037b
SPRINT S6 · 036a–040b
The route draft, attempt recorder and results tools are prepared. S6’s physical route passes remain deferred, so no accuracy, placement or response-time result is claimed.
2 / 10
Cards complete with desk evidence
037a · 037b
5 / 21
S6 points completed
16 await field evidence
0
Physical attempts recorded
Pass/fail limits not yet set
Readiness: HOLD — field evidence is missing. This is not a measured performance failure. The blind walk, signed-reference comparison, affected-view retests and independent repeat pass have not happened. Synthetic checks do not complete those tasks.
42 targets and 53 target/frontage combinations across all four streets. Two sidewalk roles, three distance bands and repeated morning/afternoon starts produce 954 planning slots.
All slots remain unverified. A reviewer must confirm safe positions and eligibility, split practical sessions and freeze the attempt list before seeing results.
The native app records a 30-second attempt with displayed property IDs, timing, tracking, confidence and offset estimates. Expected correct IDs stay in a separate reviewer file.
Logging is off by default, local and bounded. No camera images or location trail are retained.
Offline reports retain missing attempts, interruptions and wrong-card flashes after correction. Manual assistance is not counted as automatic recognition success.
Unsynchronized taps are estimates, not scored placement measurements. Empty denominators stay unavailable.
| Street | Planned slots | Field status |
|---|---|---|
| E 136 Street | 504 | Unverified |
| E 137 Street | 306 | Unverified |
| Bruckner Boulevard | 90 | Unverified |
| Willow Avenue | 54 | Unverified |
The 954 slots are a conservative coverage draft, not 954 approved or independent observations. No standing position is declared safe from a map alone. The arbitrary previously clicked building has no priority.
| Measure | Result | Why |
|---|---|---|
| Correct property identification | Unavailable | No eligible, independently reviewed physical attempts. |
| Confident wrong matches | Unavailable | No field observations or calibrated confidence criterion. |
| Placement error | Unavailable | No independently synchronized reference measurements. |
| Time to first correct card | Unavailable | No physical timed attempts. |
| Release pass/fail limits | Not set | No numerical limits have been approved. |
| Cards | Status | Delivered / remaining |
|---|---|---|
| 036a / 036b | Field review deferred | Coverage draft and route-freeze tool ready. Safe viewpoints, signed truth, final eligibility and denominator remain unconfirmed. |
| 037a / 037b | Done — desk implementation | Native per-attempt recording and readable local export/analysis verified with synthetic fixtures. Physical instrument timing remains unverified. |
| 038a / 038b | Physical pass deferred | Blind route and independent reference comparison not performed. |
| 039a / 039b | Field defects and retests deferred | Reproducible issue grouping is ready. No real field failure/fix/live-retest cycle is claimed. |
| 040a / 040b | Independent validation deferred | No repeat pass or performance-based release decision. Current readiness is evidence incomplete. |
39 native-core tests and 14 analysis tests pass. Debug simulator and unsigned Release iPhone builds succeed. Synthetic cases cover a wrong-card flash corrected later, wrong final identity, interrupted trace and missing attempt; these are test fixtures, not field results.
Full acceptance notes · Blind route draft · Reviewer planning file · Synthetic results example · Readiness data · Field workflow and tools
Real filled records are restricted local exports. They are not uploaded to this dashboard or committed to GitHub. Export before leaving the native app and review/delete external copies within 30 days.
At S6 handoff: 107 project points complete · 70 remaining. Physical tasks remain open.